Design and early operation of a new-generation internal beam dump for CERN's Super Proton Synchrotron
Authors:
A. Romero Francia,
A. Perillo Marcone,
S. Pianese,
K. Andersen,
G. Arnau Izquierdo,
J. A. Briz,
D. Carbajo Perez,
E. Carlier,
T. Coiffet,
L. S. Esposito,
J. L. Grenard,
D. Grenier,
J. Humbert,
K. Kershaw,
J. Lendaro,
A. Ortega Rolo,
K. Scibor,
D. Senajova,
S. Sgobba,
C. Sharp,
D. Steyaert,
F. M. Velotti,
H. Vincke,
V. Vlachoudis,
M. Calviani
Abstract:
The Super Proton Synchrotron (SPS) is the last stage in the injector chain for CERN's Large Hadron Collider, and it also provides proton and ion beams for several fixed-target experiments. The SPS has been in operation since 1976, and it has been upgraded over the years. For the SPS to operate safely, its internal beam dump must be able to repeatedly absorb the energy of the circulating beams with…
▽ More
The Super Proton Synchrotron (SPS) is the last stage in the injector chain for CERN's Large Hadron Collider, and it also provides proton and ion beams for several fixed-target experiments. The SPS has been in operation since 1976, and it has been upgraded over the years. For the SPS to operate safely, its internal beam dump must be able to repeatedly absorb the energy of the circulating beams without sustaining damage that would affect its function. The latest upgrades of the SPS led to the requirement for its beam dump to absorb proton beams with a momentum spectrum from 14 to 450~GeV/$c$ and an average beam power up to $\sim$270~kW. This paper presents the technical details of a new design of SPS beam dump that was installed in one of the long straight sections of the SPS during the 2019--2020 shutdown of CERN's accelerator complex. This new beam dump has been in operation since May 2021, and it is foreseen that it will operate with a lifetime of 20~years. The key challenges in the design of the beam dump were linked to the high levels of thermal energy to be dissipated -- to avoid overheating and damage to the beam dump itself -- and high induced levels of radiation, which have implications for personnel access to monitor the beam dump and repair any problems occurring during operation. The design process therefore included extensive thermomechanical finite-element simulations of the beam-dump core and its cooling system's response to normal operation and worst-case scenarios for beam dumping. To ensure high thermal conductivity between the beam-dump core and its water-cooling system, hot isostatic pressing techniques were used in its manufacturing process. A comprehensive set of instrumentation was installed in the beam dump to monitor it during operation and to cross-check the numerical models with operational feedback.
△ Less
Submitted 27 December, 2023; v1 submitted 24 December, 2023;
originally announced December 2023.
Hot Isostatic Pressing (HIP) assisted diffusion bonding between CuCr1Zr and AISI 316L for application to the Super Proton Synchrotron (SPS) internal beam dump at CERN
Authors:
Stefano Pianese,
Antonio Perillo-Marcone,
Fran�ois-Xavier Nuiry,
Marco Calviani,
Krzysztof Adam Szczurek,
Gonzalo Arnau Izquierdo,
Pietro Avigni,
Simon Bonnin,
Josep Busom Descarrega,
Thierry Feniet,
Keith Kershaw,
Jerome Lendaro,
Ana Teresa Perez Fontenla,
Thomas Schubert,
Thomas Weissg�rber
Abstract:
The new generation internal beam dump of the Super Proton Synchrotron (SPS) at CERN will have to dissipate approximately 270 kW of thermal power, deposited by the primary proton beam. For this purpose, it is essential that the cooling system features a very efficient heat evacuation. Diffusion bonding assisted by Hot Isostatic Pressing (HIP) was identified as a promising method of joining the cool…
▽ More
The new generation internal beam dump of the Super Proton Synchrotron (SPS) at CERN will have to dissipate approximately 270 kW of thermal power, deposited by the primary proton beam. For this purpose, it is essential that the cooling system features a very efficient heat evacuation. Diffusion bonding assisted by Hot Isostatic Pressing (HIP) was identified as a promising method of joining the cooling circuits and the materials of the dump's core in order to maximise the heat transfer efficiency. This paper presents the investigation of HIP assisted diffusion bonding between two CuCr1Zr blanks enclosing SS 316L tubes and the realisation of a real size prototype of one of the dump's cooling plate, as well as the assessments of its cooling performance under the dumps most critical operational scenarios. Energy-dispersive X-ray (EDX) spectroscopy, microstructural analyses, measurements of thermal conductivity and mechanical strength were performed to characterize the HIP diffusion bonded interfaces (CuCr1Zr-CuCr1Zr and CuCr1Zr-SS316L). A test bench allowed to assess the cooling performance of the real size prototype. At the bonded interface, the presence of typical diffusional phenomena was observed. Moreover, measured tensile strength and thermal conductivity were at least equivalent to the lowest ones of the materials assembled and comparable to its bulk properties, meaning that a good bonding quality was achieved. Finally, the real size prototype was successfully tested with an ad-hoc thermal test bench and with the highest operational thermal power expected in the new generation SPS internal beam dump.
△ Less
Submitted 16 November, 2020;
originally announced November 2020.